
Thermoplastic Blade Welding: Automated Assembly for Large Wind Turbines
Wind turbine blade assembly has traditionally relied on structural adhesive bonding to join blade shells to spar caps and shear webs — a process that requires 8-24 hours of cure time per blade, demands precise surface preparation, and creates permanent joints that cannot be disassembled








